Quemahoning Water Transmission Line

The goal of this project was to obtain more drinking water for Johnstown, Pennsylvania. Above is a picture of the 60'' riveted iron pipes that used to carry water to Johnstown. This job consisted of twenty-two miles of new pipe to transport the 5.75 billion gallons of water from the dam. Most of the one hundred manholes from the job were outfitted with our X-CEL watertight connectors to prevent leaking into the structure to keep the water pumps dry. Now Johnstown has fresh, safe drinking water.